您的位置:淘包网  翻译业务  正文
 
热门文章
 
   
 
最新文章
 
   
 
意见反馈
  
   
 
 
文章内容
 
工程竞标书(英文)-露茜(6)
原作者:外包网 添加时间:2007-11-30 原文发表时间:2007-11-30 人气:164 来源:www.chinaboyin.com.cn
本文章共8380字,分6页,当前第6页,快速翻页:
 
37路。

(8) Drive Sound, light alarm : after receiving command, absorb open 37th route.

     CPU板工作灯、I/O板工作灯、I/O板工作组灯、位灯均为500MS刷新一次。方法为:组灯由1~6循环点亮,位灯根据所选的点灯组,点亮该组吸起状态的开关量。

其中:CPU1块,位置D0

48路模入板2块,位置D1D8

48路开关板2块,位置D2D3

48路开出板3块,位置D4D5D6

绝缘接口板1块,位置D7

24路开入板3块,位置D1D2D3

(9) CPU board working light, I/O board working light, I/O board working combination light, position light are all refurbish one time each 500MS. The way is : the combination lights are illumed by 1---6 circulation, the location light illume and absorb the postural Digital Variables. Among them: one CPU Board ,the position is DO

Two 48 route module board, the position is D1, D8

Two 48 route switch board, the position is D2, D3

Three 48 route out board, the position is D4, D5, D6

One insulated interface board, the position is D7

Three 24 route entered board, the position is D1, D2, D3

Among them: 1 piece CPU board, the position is DO

48 route open-enter board 2 pieces, the position is D1D2.

16 route railway phase mutual inductance 6 pieces, the position is D3D4D5D6D7D8.


 
本文章更多内容<<上一页 - 1 - 2 - 3 - 4 - 5 - 6
本页地址:
相关文章

日语翻译-温权波
俄语翻译-商满园
英文翻译业务-赵美良(研究生)
德语翻译(中德文对照)

相关评论


本文章所属分类:首页  翻译业务
   
 
 
推荐文章